Airpes designed, manufactured, tested and installed a new hydraulic system that allows the beam to move ± 3º in the horizontal axis.
Initial situation description
Difficulty in aligning the nacelle to the tower during installation using current lifting beam.
Need to solve
Modify the current lifting beam to align the nacelle to the tower to improve the installation process.

Airpes designed, manufactured, tested and installed a new hydraulic system that allows the beam to move ± 3º in the horizontal axis.
The client needed a hydraulic system for the nacelle installation in the tower. The installation process of the tower wouldn’t be complete without this hydraulic system functioning in the right way.
OUR on demand solutions
Airpes Solutions
LATEST POSTS ON THE BLOG
Discover our brand new developments, events, get posted of our activity.
- 5S Lean Methodology for Industrial ExcellenceCrosby Airpes applies the 5S methodology internally to enhance safety, efficiency, and product quality. It's a key part...
- Wind Turbine Engineering: excellence in Blade InstallationCrosby Airpes applies the 5S methodology internally to enhance safety, efficiency, and product quality. It's a key part...
- Overhead Crane Parts: Complete Guide to Crane ComponentsHoists, rigging, sensors... What are the different components of an overhead crane? In this post we check it...
- Types of lifting equipmentLearn about the types of lifting equipment used in industries such as construction, wind energy and metallurgy. Discover...