Wind Sector Nacelles in WTG Towers
Airpes designed, manufactured, tested and installed a new hydraulic system that allows the beam to move ± 3º in the horizontal axis.
Initial situation description
Difficulty in aligning the nacelle to the tower during installation using current lifting beam.
Need to solve
Modify the current lifting beam to align the nacelle to the tower to improve the installation process.

Airpes designed, manufactured, tested and installed a new hydraulic system that allows the beam to move ± 3º in the horizontal axis.
The client needed a hydraulic system for the nacelle installation in the tower. The installation process of the tower wouldn’t be complete without this hydraulic system functioning in the right way.
OUR ON DEMAND SOLUTIONS
Airpes Solutions
LATEST POSTS ON THE BLOG
Discover our brand new developments, events, get posted of our activity.
- Delivery of a Yoke Blade Clamp Installation Tool in Xingjiang province (China)Airpes (China) Co., Ltd. is satisfied to celebrate its first anniversary with the delivery of the 12th tool designed...
- Installation of a wind turbine blade with a Blade Clamp: training and testing in-situThe blades of a wind turbine can measure about 80 meters. Moving them is not easy, but the...
- Control the maximum load capacity with Airpes’ weight limitersIn order to lifting weights safely you have to consider the maximum load capacity of the equipment. Learn...
- Difference between onshore and offshore wind farmsOnshore and offshore wind energy present similarities and differences. We analyze the challenges involved in working in each...