Wind Sector Nacelles in WTG Towers
Airpes designed, manufactured, tested and installed a new hydraulic system that allows the beam to move ± 3º in the horizontal axis.
Initial situation description
Difficulty in aligning the nacelle to the tower during installation using current lifting beam.
Need to solve
Modify the current lifting beam to align the nacelle to the tower to improve the installation process.

Airpes designed, manufactured, tested and installed a new hydraulic system that allows the beam to move ± 3º in the horizontal axis.
The client needed a hydraulic system for the nacelle installation in the tower. The installation process of the tower wouldn’t be complete without this hydraulic system functioning in the right way.
OUR on demand solutions
Airpes Solutions
LATEST POSTS ON THE BLOG
Discover our brand new developments, events, get posted of our activity.
- Kito Crosby: new brand, new heightsKito Crosby, the union of two large companies in the lifting and securement industry, presents its new corporate...
- Digital crane scalesOur extensive experience in the manufacture of weighing equipments has led us to design industrial scales adaptable to...
- Material lifting equipment: 4 benefits for your businessIn the bustling world of manufacturing, construction, and various industrial sectors, the efficient movement of goods and materials...
- Bridge Crane DesignsOne of the most used and versatile crane designs -specially for indoor use- is the bridge crane, as...